PLC Cycle Time Influences (Update A)
High network load can consume CPU power in such a way that the normal operation of the device can be affected; that is, the configured cycle time can be influenced.
beschreibt (1)
Zugehörige CVEs.
| ID | Schweregrad | ausnutzbar | ||
|---|---|---|---|---|
| CVE-2019-10953US | high7.5 | — | ||
ABB, Phoenix Contact, Schneider Electric, Siemens, WAGO - Programmable Logic Controllers, multiple versions. Researchers have found some controllers are susceptible to a denial-of-… | ||||
Referenzen
Externe Belege — Patches, Meldungen, Analysen.
Behebungen (11)
- Behoben1SAP120600R0071
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben2700974 ILC 151 ETH
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben6ED1052-1CC01-0BA8
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben6ES7211-1AE40-0XB0
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben750-8100 Controller
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben750-831 Controller
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben750-880 Controller
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- Behoben750-889 Controller
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- BehobenES7314-6EH04-0AB0
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- BehobenILC 191 ETH 2TX
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.
- BehobenModicron
ABB concludes the reported behavior is not a vulnerability but is due to a misconfiguration of the PLC watchdog, which was left in the default factory settings. This has led to a configuration that does not match the expectations expressed in the test cases and the result is the PLC not reacting as intended. This misconfiguration can be fixed by setting an appropriate combination of task priority, task cycle time, and watchdog settings. Please see the Onboard Ethernet Handling in CPU Firmware chapter (System Technology for AC500 V2 Products > System Technology of CPU and Overall System > Onboard Technologies > Ethernet > Ethernet Protocols and Ports for AC500 V2 Products > Onboard Ethernet Handling in CPU Firmware) for further guidance.